Sign In | Join Free | My chinacomputerparts.com
China Beijing Tonghe Testing Machine Co., ltd logo
Beijing Tonghe Testing Machine Co., ltd
WE OFFER ONLY WHAT SUITS YOU BEST!
Verified Supplier

2 Years

Home > Pipe Testing Equipment >

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings

Beijing Tonghe Testing Machine Co., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings

  • 1
  • 2

Model Number : CHW-63M

Number of cycles : Any number of times from 0 to 100,000

Payment Terms : L/C,D/A,D/P,T/T

Control method : Plc control

MOQ : 1 set

Packaging Details : Standard export wooden cases

Display mode : Touch screen display

Supply Ability : 20 sets per month

Certification : ISO9001, CE

Temperature homogeneity : ±0.5℃

Delivery Time : 10~15 work days

Brand Name : TH

Product name : Pipe Testing Equipment Optimized for 5000‑Cycle Hot‑Cold Alternating Pressure‑Temperature Cycle Test of Plastic Pipes & Fittings

Place of Origin : BEIJING, CHINA

Velocity of flow : >0.9m/s

Contact Now

Pipe Testing Equipment Optimized for 5000‑Cycle Hot‑Cold Alternating Pressure‑Temperature Cycle Test of Plastic Pipes & Fittings

Summary:

Serving as a long‑term service‑lifetime verification assessment, this test scheme requires one full assembly of plastic pipeline system specimens to finish 5,000 alternating hot‑and‑cold water circulation cycles. One complete cycle lasts for 30 minutes, split into a 15‑minute cold‑water circulation segment followed by another 15‑minute hot‑water circulation segment. These rigorous assessment criteria place stringent demands on test hardware regarding non‑stop continuous operation capability and consistent, reproducible performance output.

Custom‑engineered by our manufacturing plant for a reputable European brand, this test unit is fully constructed to satisfy European technical specifications. Extensive years of on‑site operation across European markets have verified its reliable track record free of technical malfunctions and quality‑related flaws.

Four primary functional sub‑assemblies make up the overall system: cold‑water exchange actuation module, hot‑water exchange actuation module, specimen test enclosure and industrial cooling chiller. It boasts sophisticated visual appearance, modular mechanical configuration, cutting‑edge control logic, dependable runtime performance, solid construction quality and an intuitive user‑centered operating interface.

Instrument Features:

Full Closed-Loop Control Architecture

Equipped with an imported full digital control system, this testing device achieves high-precision closed-loop pressure regulation for the entire pipeline testing circuit. During ongoing test procedures, the system automatically calibrates the operating status of main circulating pumps and regulating valves based on real-time collected data including fluid temperature, test duration and pipeline flow velocity. This intelligent adjustment maintains balanced and stable internal pressure across the whole testing system. The unique structural design successfully prevents water hammer risks during rapid switching between hot and cold water circulation modes, with overall operational performance exceeding the requirements of applicable national industry standards.

Intelligent Cycle-Transition Mechanism

The system control platform adopts real-time data monitoring covering sample pipeline inlet and outlet water temperature, liquid level status of cold and hot water tanks, as well as mode switching time parameters to achieve automatic system state adjustment. When completing cycle switching, the system precisely controls the return valves of dual water tanks to guide most cold water back to the cold water tank. The temperature difference between the cold and hot water tanks is strictly controlled within 3°C, effectively reducing overall energy consumption and realizing energy-saving operation during long-duration uninterrupted system testing.

Low-Noise Performance Enhancement

The test pipeline system is embedded with an independently developed water flow control component. This customized structural design effectively weakens operational noise generated by high-speed water flow scouring and friction inside the pipeline, delivering low-noise and stable test operating conditions.

High-efficiency Refrigeration Configuration

This system adopts premium imported industrial chillers as the core low-temperature cooling source. Adopting mature water-to-water cooling technology, the system optimizes the operating state of the compressor and keeps it running within the optimal working range at all times. This design not only significantly improves the overall refrigeration efficiency of the equipment but also effectively reduces unit operating loss and greatly extends the overall service life of industrial chillers.

Meet standards:

1.ISO 10508: Governing specifications for thermoplastic pipes and fittings deployed within hot‑cold water service networks

2.ISO 19893: Plastics piping systems — Thermoplastic pipes and fittings for hot and cold water — Testing procedure to evaluate temperature‑cycling resistance of pre‑assembled piping assemblies

3.GB/T 19993‑2005: Thermal cycling test procedure for hot‑melt‑joined plastic water supply & drainage piping and joint assemblies

4.GB/T 18997.1‑2003: Aluminium‑plastic composite pressure pipes — Part 1: Aluminium‑plastic pipes featuring lap‑welded aluminium liners

5.GB/T 18997.2‑2003: Aluminium‑plastic composite pressure pipes — Part 2: Aluminium‑plastic pipes with butt‑welded aluminium tubing

6.GB/T 18742.2‑2002: Polypropylene piping systems for hot and cold water applications — Part 2: Pipe raw materials

7.GB/T 18742.3‑2002: Hot‑cold water polypropylene piping systems — Part 3: Connecting fittings

8.GB/T 18992.2‑2003: Hot‑cold water systems adopting cross‑linked polyethylene (PE‑X) pipe materials — Part 2: Pipe base materials

9.GB/T 18993.2‑2003: Chlorinated polyvinyl chloride (PVC‑C) piping systems for hot and cold water — Part 2: Pipe raw materials

10.GB/T 18993.3‑2003: Chlorinated polyvinyl chloride (PVC‑C) piping systems for hot and cold water — Part 3: Fitting components

11.GB/T 18991‑2003: Thermoplastic pipes and fittings intended for hot‑and‑cold water circulating systems

Technical parameter:

Project

Index

Pressure

Control range

0.40 Mpa ~1.20 Mpa

Control accuracy

Set value ±0.02 mpa (including cold-to-hot switching process)

Test stations

1–6

Maximum total measured cross-sectional area

6200 mm² (2 × φ63); can be customized upon request.

Circulation time for both hot and cold water

Any setting between 600s and 1800s

Time for alternating hot and cold water

≤60s

Number of cycles

Any number of times from 0 to 100,000

Maximum length of the straight pipe section in the sample

3700mm

Display mode

Touch screen display

Control method

Plc control

Velocity of flow

>0.9m/s

Headwaters

Water quality

Pure water, deionized water, or softened water

Automatic water supply pressure

>0.05mpa

Temperature display reading error

±0.2℃

Temperature difference between the inlet and outlet of the sample

<2℃

Cold water storage cistern

Temperature control range

20°c to room temperature (room temperature> 20°c)

Temperature control accuracy

Set value ±0.5°c

Temperature homogeneity

±0.5℃

Hot water tank

Temperature control range

Room temperature to 95°c

Temperature control accuracy

Set value ±0.5°c

Temperature homogeneity

±0.5℃

Source

380(1-15%)vac~380(1+10%)vac 50hz 25kw

Outline dimension

L5200 mm × W3200 mm × H2100 mm

Installation size

L6000 mm × W4000 mm × H3000 mm

Total weight

3210kg

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings


Product Tags:

Plc Control Pipe Testing Equipment

      

Pressure Temperature Cycle Test Equipment

      

Pressure Temperature Cycle Testing Equipment

      
China Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings factory

Plc Control Pipe Testing Equipment For Pressure Temperature Cycle Test Of Plastic Pipes Fittings Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Tonghe Testing Machine Co., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)